Wesleyan School

Light gauge steel roof framing with integrated skylight supports, developed through early design coordination to align the school's scope, budget, and installation.

System Type icon

System Type

Light Gauge Steel

Completed icon

Completed

2023

Location icon

Location

Atlanta, GA

Project overview

For Wesleyan School Young Hall in Peachtree Corners, Georgia, our team provided a complete light gauge steel roof truss system engineered to support the academic building’s distinctive roof design and structural requirements. The project included the design, fabrication, delivery, and installation of high roof trusses, drag trusses, overbuild trusses, monitor roof framing, skylight support framing, and specialized girder trusses and rafters integrated with a pre-engineered skylight system. Our team was infolded early in the design process to help shepherd the scope and budget from SD’s through CD’s to ensure accountability to the budget and full coordination with other trades. From early design interactions to ensuring an on time delivery, this project highlights our expertise in delivering complex light gauge steel framing solutions for educational facilities where precision, coordination, and structural reliability are essential.

Project Type

Education

System

Light Gauge Steel

Size

27,860 SF

Completed

2023

Location

Atlanta, GA

Let’s Talk Through the Work Ahead

Bring clarity, coordination, and confidence to your next complex project. Truss Link is ready to help you align the structural approach early.