
Wesleyan School
Atlanta, GA
Light gauge steel roof framing with integrated skylight supports, developed through early design coordination to align the school's scope, budget, and installation.
View Project: Wesleyan SchoolEngineered light gauge steel roof trusses installed over concrete roof decks, creating an efficient framing system designed around the project's structural requirements.
Specialty
2024
Knoxville, TN
Truss Link provided a complete light gauge steel roof truss system engineered to meet the structural requirements and design intent of the project while delivering an efficient, durable, and code-compliant framing solution. Designed and installed in accordance with project loading criteria, the roof system utilized cold-formed steel trusses over concrete roof decks, providing a structurally efficient framework capable of supporting the building’s roof assembly while maximizing installation efficiency in the field.
Project Type
Education
System
Specialty
Size
44,917 SF
Completed
2024
Location
Knoxville, TN


Atlanta, GA
Light gauge steel roof framing with integrated skylight supports, developed through early design coordination to align the school's scope, budget, and installation.
View Project: Wesleyan School
Florence, SC
Turnkey light gauge steel framing for a complex university roof, with engineering and installation phased around a demanding construction schedule.
View Project: Francis Marion University: School of Education and Business
Cookeville, TN
Metal floor decking and shoring for multi-story student housing, combining engineering support, material procurement, and coordinated installation across multiple floor levels.
View Project: Tennessee Tech UniversityBring clarity, coordination, and confidence to your next complex project. Truss Link is ready to help you align the structural approach early.