Long Span Decking

Built for commercial projects where spans, loads, sequencing, and structural coordination all need to work together. Truss Link helps teams align elevated floor and deck systems with the broader structural package so the work moves forward with greater clarity.

Long Span Decking system illustration

Deck Systems That Support the Way the Project Comes Together.

Long span decking is more than a surface or support layer. It affects how loads are carried, how trades coordinate, and how the structural system performs in the field. Truss Link helps teams plan deck systems around the realities of span, sequencing, and installation.

1

SPAN CAPABILITY

Designed to support larger openings and commercial layouts where structural flexibility matters.

2

LOAD COORDINATION

Deck systems are planned around project requirements, structural loads, and the systems they connect to.

3

FIELD SEQUENCING

Coordinating decking early helps teams plan the order of work before installation begins.

4

SYSTEM INTEGRATION

Decking, trusses, framing, and field conditions are considered together so the system can be built with fewer disconnects.

Why teams trust Truss Link.

Field-Aware Planning icon

Field-Aware Planning

We think beyond fabrication, considering sequencing, access, and installation realities early.

Clear Communication icon

Clear Communication

Teams know what is happening, what is needed, and where decisions could affect the field.

Smoother Field Coordination icon

Coordinated Engineering

Truss systems are coordinated around project requirements, field conditions, and adjacent scopes.

Built for Performance icon

Built for Performance

Our work is guided by the long-term demands of the structure, not just the immediate install.

“With proven engineering and installation, they are the ones we trust.”

-Bill Cook,
Trend Construction

Long Span Decking in action.

Tennessee Tech University construction in Cookeville, TN

Tennessee Tech University

Cookeville, TN

Metal floor decking and shoring for multi-story student housing, combining engineering support, material procurement, and coordinated installation across multiple floor levels.

View Project: Tennessee Tech University
Merrill Gardens construction in Columbia, SC

Merrill Gardens

Columbia, SC

Metal floor deck and shoring installation for a multi-level structure, with coordinated deck placement and temporary support across multiple construction phases.

View Project: Merrill Gardens

2 projects

Align the Decking System Before the Field.

Let’s talk through your project and determine how elevated floor and deck systems should coordinate with the structural work ahead.